Crooked Gap Clubhouse installation
Crooked Gap Clubhouse starts out in the design phase with Barbara's sketch:

During the initial design process, Barbara, Jeff & Marco spend a day doing a "stick-out" on site, using rough strips of wood to layout the shape of the Clubhouse on the hillside.
Then later, after building, staining & detailing the structure in our shop, we bring in the pieces to install. The deck goes in 1st, matching the original stick out to a "T".

On this site, the truck is parked below and every play structure piece, along with all tools and materials, are lugged up the hill!

The Gable roof is in 2 pieces, and like everything else, has to come up the hill, across the bridge


and then up into place.
The crew, happy but weary at the end of the day from a job well done.


During the initial design process, Barbara, Jeff & Marco spend a day doing a "stick-out" on site, using rough strips of wood to layout the shape of the Clubhouse on the hillside.


On this site, the truck is parked below and every play structure piece, along with all tools and materials, are lugged up the hill!

The Gable roof is in 2 pieces, and like everything else, has to come up the hill, across the bridge



The crew, happy but weary at the end of the day from a job well done.